Top
MVD New Mexico  Photo
  • Project Info

MVD New Mexico

  • Alamogordo MVD Office Finish Upgrades
    • Remove/Reinstall Wall Hung Items for Flooring/Painting in Each Area Remove All Existing Flooring and Cove Base Remove Existing Wall Tile in Men/Women Restrooms 103/104 Remove Existing P-Lam Counter at Breakroom 110 & Install Solid Surface Counter with 4" Backsplash & Integral Kitchen Sink New Employee Egress Hollow Metal Door on East Side of Building with Cipher Lock Hardware New Cipher Lock Hardware For Existing Employee Access Door on North Side of Building. New ADA Operators at Existing Storefront Doors 101A/101B with Wireless ADA Pushbuttons. Patch & Paint All Interior Walls Prep & Paint Existing Customer Service Cabinets - Excludes Tops & Customer Face Patch & Paint All Exterior Stucco Walls Including Patching New Flooring to consist of: (All Areas of Carpet & VCT with Get 4” Cove Base) Tile Carpet: Hearings 105 Manager 111 Supervisor 112 Customer Service 114 with Nosing’s at Raised Floor VCT: Janitorial 106 Equipment 107 Women 108 Men 109 Break 110 Storage 113 Ceramic Tile: Entrance 101 with Tile Base Reception 102 with Tile Base Women 103 with 4' Wainscot Men 104 with 4' Wainscot Furnish & Install New Baby Changing Stations at 4 Restrooms Furnish & Install New 18" Grab Bars at 4 Toilets Remove & Reinstall Existing Toilet Accessories, Toilet Partitions, Fire Extinguishers, and Signage for Painting. Furnish & Install Basic Fed-Ex/UPS Dropbox at Rear of Building Furnish & Install Window Blinds & Window Tinting at 4 Reception Area Windows Only Plumbing to Consist of: Remove, Clean, & Reinstall All Toilets as Required for New Flooring. (Install New Angle Stops and Supply Lines) Remove, Clean, & Reinstall All Bathroom Wall Mounted Sinks as Required for New Flooring/Wainscot. (Install New Angle Stops, Supply Lines, P-Traps, and Insulated P-Trap Covers) Remove, Clean, & Reinstall All Bathroom Floor Drains (Adjust for New Floorings as Required) New Faucet at Breakroom 110 Kitchen Sink Electrical to Consist of: Remove & Reinstall Existing Light Switch Cover Plates for Painting Remove & Reinstall Existing Outlet Cover Plates for Painting Remove & Reinstall Existing Comm/Data Cover Plates for Painting Remove & Reinstall Existing FA Devices for Painting Remove & Reinstall Existing Wall Mounted Lights for Painting Furnish & Install New Exterior Weatherproof Outlet Covers at Exterior Furnish & Install New Occupancy Sensors at Rooms 103/104/105/106/107/108/109/113 Power to Head of Doors 101A & 101B for ADA Operators
    • Sq Ft: 3,500