Top
Inn of the Mountain Gods  Photo
  • Project Info

Inn of the Mountain Gods

  • Inn of the Mountain Gods - Convention Center Restroom Remodel
    • Protect Existing 18"x18" Floor Tile to Remain Demo Existing 4"x4" Wall Tile/Cove and Tile Backerboard as Required Demo Existing Solid Surface Counters and Brackets as Required Remove, Store, and Reinstall Existing Toilet Accessories Furnish & Install New Solid Surface Vanity Tops with Integral Sinks and Backsplashes to Bottom of Existing Mirrors in Men’s & Women’s Restroom. New ADA Brackets and Aprons/Kick panels will be Installed to Conceal Piping Prep & Patch Existing Drywall Ceilings and Repaint Complete in all Three Restrooms Prep & Paint Existing Hollow Metal Door Frames Furnish & Install New Wall/Base Tile from Floor to Ceiling at all Walls in all Three Restrooms with Metal Inside and Outside Corners (Lighting Fur downs will Receive Paint on Faces) Furnish & Install New Vertical 18” Grab Bars in ADA Stalls in All Three Restrooms to Meet New Code Remove & Replace 1-12”x12” Wall Access Panel in Men’s Restroom Remove & Replace Existing Toilet Partitions and Urinal Screens with Stainless Steel Toilet Partitions and Urinal Screens Remove & Reinstall Plumbing Fixtures Including Urinals, Faucets, and Toilets New Angle Stops, Wax Rings, Sink Drainpipe Assemblies, Supply Lines New Pipe Wrap at Unisex Restroom Wall Hung Sink Replace Fire Sprinkler Head Escutcheons at Ceiling Heads as Required Remove, Clean, and Reinstall Exhaust Grilles Remove and Replace Outlet Covers Only (Outlets to Remain) with Stainless Steel in All Three Restrooms
    • Sq Ft: 1,423
    • Completion Date: 03/18/2022